Quote:
Originally Posted by PiCiJi
Jim Power "Two Live Crew" crack hangs. it modifies the blitter while it's running and disables "Skip B" and "Skip Y" same time.
When this happens and Stage X is active, the crack intro expects "probably" Stage A to be active in addition to Stage Y.
At least another "shifter bit" is necessary so that the blitter counts down faster.
|
"Nice". Another Two Live Crew production with broken blitter usage. Other was Lotus II cractro that does it differently. Already listed in this thread (
http://janeway.exotica.org.uk/release.php?id=17846).
Any "normal" shifter bit combination does not seem to work fully correctly. I guess this needs logic analyzer check..